InsulationMatch arranges professional foil and multifoil installation across the UK: a property assessment first, a written build-up with certificate and target U-value, a fixed quote, and a photographed installation to one standard.
- Survey before product
- Written build-up and U-value
- Fixed quote, inclusions listed
- If foil is wrong for you, we say so

Survey first. Product second.
Book a home survey to check your roof space, existing insulation, ventilation and available depth. If foil is suitable, we specify the build-up and provide an installation quote. If mineral wool, PIR or another method is the better answer, we will tell you — and we will quote that instead.
Roof, loft, ventilation and depth checked before a product is recommended. No obligation.
Where we install foil and multifoil
Loft rafters
Multifoil under or between rafters to make a warm roof without losing headroom. Under-rafter detail · Between-rafter detail.
Pitched roofs
Re-roofing or internal upgrade of a pitched roof, with the ventilation strategy agreed before the first staple. Foil roof insulation.
Room-in-roof
Sloping ceilings, dwarf walls and dormers insulated as one continuous layer. Room-in-roof guide.
Loft conversions
Specified to the Building Regulations target for a converted roof, with building control documentation. Loft conversion insulation.
Roof spaces and loft floors
Foil over joists under storage boarding where a thin layer is needed. On an open loft floor we will usually recommend mineral wool instead. Foil for lofts.
What the survey checks
| Check | Why it matters |
|---|---|
| Roof condition | Foil is fixed to the rafters for decades; a leaking or tired covering is fixed first. |
| Existing insulation | Old wool, boards or foil change the build-up and the dew-point position. |
| Moisture and condensation | Staining, damp timbers or mould tell us the roof already has a ventilation problem. Why. |
| Ventilation path | Eaves, ridge, tile vents or a breathable membrane — the route must survive the installation. |
| Rafter depth | Decides whether foil alone, foil plus PIR, or PIR alone reaches the target. Thickness guide. |
| Electrics and services | Cables, downlighters, flues and tanks need detailing, clearances and sometimes rerouting. |
| Access | Hatch size, ladder, working space and where materials come in. |
| Intended use | Storage, a habitable room or a cold roof space each point to a different route. |
| Existing spray foam | Assessed separately before anything is fitted over or against it. Spray foam. |
Systems we install
We specify certified multifoil quilts fitted to the manufacturer's certified build-up, combined with PIR board where the target U-value requires it. Product brands are named in every specification and quote; we do not list manufacturers here that a specific project may not use, and we hold no manufacturer approval unless it is stated in writing on your quote. Product comparison: Best foil insulation.
The build-up, layer by layer
Every quote comes with a build-up drawing. The interactive version below is the standard warm-roof arrangement; yours is adjusted to your rafters, covering and ventilation.
Price guidance
| Project | Indicative installed range | Typically includes |
|---|---|---|
| Multifoil to rafters, open loft | £2,000 – £6,500 (semi-detached) | Quilt, tape, counter-battens, fixing, waste removal |
| Multifoil + PIR to rafters, room-in-roof | £2,500 – £7,000 | As above plus board, plasterboard ready |
| Foil over joists under boarding | £800 – £2,200 | Foil layer, raised loft legs, boarding |
| Garage or outbuilding lining | £600 – £1,800 | Foil to studs and rafters, taped |
Indicative ranges compiled from published UK cost guides and installer input, compiled and reviewed 3 September 2026. Your quote is fixed after survey. Full cost guide.
What a quote includes and excludes
- Included: survey report, specification with certificate reference and target U-value, materials, counter-battens, tapes and fixings, labour, waste removal, handover photographs and documentation, building control notification where the work requires it.
- Excluded unless quoted: roof repairs, plasterboard and decoration, moving electrics or plumbing, spray foam removal, scaffolding, structural work.
Installer credentials
Every installer working through InsulationMatch has agreed to our installation standard. Before any installer is added we verify public liability insurance, and we record any competent person scheme membership and manufacturer training with the certificate number. Credentials are stated on your quote for the team that will do your work; we do not publish generic accreditation claims here.
Guarantees, and who provides them
Two guarantees can apply, and they come from different people. The workmanship guarantee is written and provided by the installing company, with its length stated on the quote. The product guarantee is the manufacturer's and depends on the product being installed to its certified build-up — which is why we photograph the installation before it is covered. InsulationMatch does not itself issue guarantees.
How the installation runs
- SurveyRoof, loft, ventilation, depth and services checked. Usually 45–90 minutes.
- SpecificationWritten build-up, product, certificate and target U-value.
- QuoteFixed price, inclusions and exclusions, timeline.
- InstallationMost rafter jobs take one to three days. Ventilation path protected throughout.
- Quality controlAir gaps, tape, continuity and penetrations checked against the specification and photographed.
- HandoverPhotographs, specification, guarantee documents and building control paperwork where applicable.
Where objections usually come from
- “Why does the air gap matter?” — Air gap guide
- “Will this cause condensation?” — Condensation guide
- “What U-value can it reach?” — U-value guide
- “Is it thick enough?” — Thickness guide
- “Does it need building control?” — Building regulations
- “Does foil actually work?” — The evidence
Case studies and reviews
Completed projects are written up in the project library — property, survey findings, system chosen and why, duration, photographs — alongside typical project scenarios that show how each situation is assessed. We publish only verified reviews from completed projects; we do not display third-party ratings we cannot verify.
Foil insulation installation across the UK
InsulationMatch supports homeowners across the UK through a nationwide network of field representatives, survey capability and insulation installation teams. Coverage and availability depend on postcode, property type and the insulation solution required. Choose your region below or enter your postcode to check current availability.
All areas we cover · How we match installers. The installing company for your project is named on your quote with its insurance and any scheme registration.
Book a free survey, or run the two-minute check first and see the likely route before anyone visits.
Questions homeowners ask
Do you install foil insulation yourselves?
Will you push foil if I do not need it?
How long does a survey take?
Is the price fixed?
Can foil be fitted over old insulation?
Who notifies building control?
- GOV.UK — Approved Document L, Volume 1: Dwellings (current edition, as amended) — checked 2 September 2026
- GOV.UK — Approved Document F, Volume 1: Dwellings (ventilation) — checked 2 September 2026
- BSI — BS 5250:2021 Management of moisture in buildings — checked 2 September 2026
- Competent Person Schemes — GOV.UK register — checked 2 September 2026